Wednesday, July 25, 2007

July 25 -- drumroll please ...

yes, it's happened. The last tile is down ... (before I tackle the games room in September that is) ... we're on schedule.

I realized after I dropped the last tile into place that there should have been some fanfare. Oh well. It felt good anyway.

Today I spent the morning measuring then cutting tiles -- 6x10's for the bathroom baseboard and the tiles for under the stairwell and in front of the basement sliding doors. Then, over lunch, I watched the Tour de France current and last mountain stage -- which was already over but I had recorded it during the a.m. -- skipping through the commercials and catching the drama at the ending -- or lack thereof.

ok -- time for mortar -- I installed the bathroom baseboard and trim strips first, which turned out to be fairly easy. Then I installed the tiles under the stairwell, lying down on the job of course (this is the very bottom, i.e. 3 feet to nothing high), then the basement door.

Then, cleanup, then celebratory beer ... next up, shower.

Tomorrow -- grout.

I worked out how many tiles it will take to do the games room and the closet underneath the stairwell landing -- 117 + 8 = 125. It is probably a 5 day job -- three to tile, including cutting, and two for grout. Later ... probably September.

1 comment:

George said...

DeWalt yellow for the boathouse door would be cool, but probably not something Sandy would OK. You might consider etching a large, door-sized maple leaf with two different but very close colors of red for an interesting effect...

The tile looks good! It must feel good to be almost done for now.