I'm basically finished with the flooring, from a large scale perspective. I've got a diddly piece to cut for the doorway to the upstairs bedroom hallway and then I'll lay another piece or two and wait to see what we do vis-a-vis the carpeting on the stairs.
I've got some transition strips to put down -- hallway to elevator and River Room door slider that I left because I want to caulk that area like crazy before finishing it up. I need to do the same with the den/loft slider too. I've got shelves to figure out and install for the bathroom entrance-way and Front Bedroom, lighting to add in the hallway which means working up in the attic, switches to relocate while I'm up there ...
I'm not bored yet ! Oh yes, and before I do any of that, I've got baseboard to do so that I can finish the den/loft.
We're going to try putting the computer desk in a different location. I've already run the cable so that I can use the modem over there. Then I have to start shopping for furniture or think about building a small shelving unit.
Today ... we may go to Orlando to hit Costco. We didn't get to Costco at all last year.
It's cold out there ! 39F ! I'm going to have some cold temps for the start of my ride tomorrow, likely below freezing but quickly warming. I have some prep to do for that, setting up the route etc. in my Garmin.
We had a rib steak out of the freezer for dinner. It didn't look very good, from a steak standpoint, so I trimmed it and cubed it and Sandy did a stir fry.
Onward.
Friday, February 1, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment