I basically spent the entire day working on the irrigation system, once Jason et al had left around 11am. Prior to that we did go out in the boat, inspecting some of the sailboats pushed up into and onto the mangroves, just up the "river" from us. I always have to put river in apostrophes because it's not really a river, it's an estuary.
There were several breaks in the irrigation system that I needed to fix; one head alongside the driveway that had obviously been driven over multiple times; a four-way split in one of the garden beds and a pipe in the other bed. The latter two were damaged by Liz gardening. The four way was a real pain as I had to cut and splice all four lines, two of them 3/4" and two 1/2" pipes. Sunday, October 30, 2016
Oct 29 - sprinkling
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment